Will Your Business Really Get 45%? The SEAI Cost Cap and Payback, Worked Through

The enhanced NDMG is described as a 45% grant — but SEAI pays the lower of a per-kWp band value and 45% of cost. Here is how to tell which one applies to your quote, and what it does to payback.

By Smart Solar Editorial · Updated 6 October 2026 · 8 min read

Commercial solar installation on an Irish business premises

The Government describes the enhanced Non-Domestic Microgen Grant as raising support "from circa 23% of the cost of installation to 45% of eligible costs". That is true at the scheme level — but for any individual business, 45% is a ceiling, not a guarantee. Whether you get the full 45% depends on one number: your installed price per kWp.

Two limits, and SEAI pays the lower one

SEAI's Application Guide sets out the rule. On completion, the grant paid is the lower of:

  1. The band value for your system size — a fixed amount from SEAI's per-kWp table (for example €45,200 for 100 kWp).
  2. 45% of your invoiced eligible cost — the maximum aid intensity allowed under EU state-aid rules (GBER Article 41), assessed across all State funding combined.

So:

  • If your quote is cheap relative to its size, 45% of cost is the smaller number — you receive exactly 45%.
  • If your quote is expensive relative to its size, the band value is the smaller number — you receive the band value, which works out at less than 45% of what you paid.

The break-even price per kWp

Divide the band value by 0.45 and you get the cost at which both limits are equal. Below this price per kWp you receive exactly 45%; above it, your percentage falls.

System sizeBand valueYou get 45% if you pay…At a typical 2026 price you get…
10 kWp€7,200≤ €1,600/kWp45% at €1,450/kWp
30 kWp€17,200≤ €1,274/kWp40% at €1,450/kWp
100 kWp€45,200≤ €1,004/kWp39% at €1,150/kWp
250 kWp€100,200≤ €891/kWp42% at €950/kWp
500 kWp€175,200≤ €779/kWp41% at €850/kWp
1,000 kWp€325,200≤ €723/kWp42% at €780/kWp

The "typical price" column uses the indicative 2026 Irish market prices from our commercial solar cost guide. Your quotes will differ — which is the point: try them in the calculator.

What this means when you compare quotes

  • A more expensive quote does not earn a bigger grant once you are above the break-even price — the band value is fixed. Every extra euro comes out of your pocket.
  • A very cheap quote earns exactly 45%, so the grant falls with the price — but your net cost still falls too. Lower price is always better for you.
  • Keep non-eligible items off the grant invoice. Batteries, EV chargers and other add-ons are not eligible. Mixing them in doesn't raise the band value and can complicate the claim.
  • Compare net cost, not grant size. The right question is "what do I pay after the grant?", not "which installer gets me the biggest grant?".

Payback examples with the enhanced grant

These are simple, illustrative paybacks for systems sized to a business's daytime demand. Assumptions: 950 kWh per kWp per year, 85% of generation used on site at 25c/kWh and 15% exported at 15c/kWh — about €223 of value per kWp per year. They exclude finance, tax allowances, maintenance and panel degradation.

SystemPrice ex VATEnhanced grantNet costAnnual valueSimple paybackPayback on previous grant
30 kWp€43,500€17,200€26,300€6,7003.9 years5.2 years
100 kWp€115,000€45,200€69,800€22,3003.1 years4.1 years
250 kWp€237,500€100,200€137,300€55,8002.5 years3.4 years
500 kWp€425,000€175,200€249,800€111,6002.2 years3.0 years

Two caveats matter more than the decimals:

  • Your electricity price drives everything. Large users on negotiated contracts often pay well under 25c/kWh, which lengthens payback. Small businesses on standard tariffs often pay more.
  • Self-consumption drives the rest. A system that exports half its output earns far less per kWp. The scheme itself requires systems to be sized for self-consumption.

Tax: grants reduce the cost you can write off

If your business plans to claim capital allowances on the system, these are generally calculated on the cost net of grants — so the enhanced grant reduces the allowance base. Confirm the treatment, including whether the Accelerated Capital Allowance applies to your equipment, with your accountant before you model it.

Bottom line

Expect somewhere between roughly a third and 45% of your installed cost back for a typical business system — the higher end if your quote is keenly priced. Either way the enhanced grant cuts typical paybacks by about a quarter compared with the previous rates, and the only way to find your real number is with real quotes.

Get 3 free quotes from SEAI-registered installers — free and no obligation.

Frequently asked questions

Does the SEAI business grant always pay 45%?

No. SEAI pays the lower of the per-kWp band value and 45% of the invoiced eligible cost. You receive exactly 45% only if your price per kWp is at or below the break-even point for your system size.

What price per kWp do I need to get the full 45%?

Divide the band value by 0.45. For example, a 100 kWp system has a band value of €45,200, so you receive the full 45% if the eligible cost is €100,444 or less (about €1,004 per kWp).

Does a higher quote mean a bigger SEAI grant?

Only up to the band value. Above the break-even price, the grant is fixed at the band value and every extra euro is paid by you.

What is the payback on commercial solar with the 45% grant?

On our illustrative assumptions (25c/kWh, 85% self-consumption), simple payback is roughly 2–4 years for systems from 30 kWp to 500 kWp, around a quarter shorter than on the previous grant rates. Your tariff and self-consumption will change this.