How to Apply for the SEAI Business Solar Grant: Step-by-Step (2026)

The exact order of steps for the enhanced SEAI business solar grant — from choosing a registered company to getting paid — with the documents you need and the mistakes that cost businesses their grant.

By Smart Solar Editorial · Updated 6 October 2026 · 9 min read

Business owner reviewing a commercial solar proposal

Applying for the enhanced SEAI Non-Domestic Microgen Grant (NDMG) is not complicated, but the order of the steps is strict. Buy panels or start work a day too early and SEAI can withdraw the entire grant. This guide follows SEAI's Application Guide and Terms and Conditions step by step.

Before you start: have these ready

  • Your MPRN — the 11-digit Meter Point Reference Number on your electricity bill. The address and Eircode registered to it is where SEAI will send post, so check ESB Networks has it right.
  • The year the building was built and occupied — it must be on or before 31 December 2024 under SEAI's current terms.
  • A business identifier — such as your CRO number.
  • An email address for the online application.
  • Bank details (BIC and IBAN) for an account that accepts electronic transfers. SEAI cannot currently pay into Credit Union accounts.
  • Tax clearance — if your business will receive more than €10,000 in grants from public bodies in a calendar year, you need a valid Tax Clearance Certificate (apply through ROS).

Step 1 — Get quotes from SEAI-registered companies

Only companies on SEAI's list of Registered Non-Domestic Microgen (Solar PV) Companies, using an installer on SEAI's list of registered installers, can carry out grant-funded work. SEAI recommends getting quotes from several. Ask each company for:

  • System size in kWp and expected annual generation
  • How much of that generation your site will use itself (the scheme funds self-consumption, not export-only systems)
  • An itemised price that separates eligible solar PV costs from anything else — batteries are not eligible
  • Which ESB Networks application route your system needs and how long it is likely to take
  • Their install timeline and when they will upload completion documents

Step 2 — Sign a formal contract

Before you apply, SEAI requires you to agree a formal contract with your chosen company. Registered companies are obliged to use one, and SEAI publishes a model contract. If a company won't provide a written contract, SEAI's advice is not to proceed with it.

Step 3 — Apply online (you apply, not your installer)

Apply through SEAI's microgeneration application portal. The applicant is the owner of the business or the authorised signatory of the farm, public body or non-profit — SEAI's terms say neither the company nor an assessor may apply on your behalf. You will enter the MPRN, building year, your chosen registered company and the system details.

Double-check your BIC and IBAN: SEAI flags incorrect bank details as a common cause of payment delays.

Step 4 — Wait for your letter of offer

Do not buy materials or start any work until you have your letter of offer. Costs incurred before grant approval are ineligible and can result in the entire grant being withdrawn.

Once you accept the offer, it is valid for eight months. Within that time you must complete the installation and submit the Declaration of Works and supporting documents.

Step 5 — Your installer applies to ESB Networks

Your company must apply to ESB Networks to connect the system — before installing it. SEAI says this takes at least four weeks (20 working days). The paperwork depends on the connection type: an NC6 form for micro-generation, an NC7 Mini-Generation Installation Confirmation, or a Final Operational Notification for NC5/NC8 connections. Larger systems can take considerably longer, so start this as soon as your offer arrives.

Step 6 — Install and pay

Once ESB Networks has approved the connection, the installation goes ahead. All electrical work must be done by a Safe Electric Ireland registered electrician. You then pay the company in full — the grant can only be claimed after the measures are fully completed and the company has been paid.

Tip: tell your business or building insurer about the planned works before they start.

Step 7 — Your company uploads the completion pack

Your installer uploads these to SEAI's portal:

  1. Declaration of Works (signed by a registered installer)
  2. Test and Commissioning Certificate
  3. Safe Electric (RECI) Certificate 3
  4. The relevant ESB Networks documentation (NC5/NC6/NC7/NC8)
  5. An invoice describing the works — the basis for the 45% calculation
  6. Photographs of the installation

SEAI asks companies to upload everything within one to three days of completion. Payment cannot be processed until all documents are in.

Step 8 — Inspection (sometimes) and payment

SEAI checks the claim and may select your site for a desktop audit or on-site inspection. If selected, you must give access within 14 days. If you rent the building, you are responsible for getting the landlord's co-operation — a landlord's refusal is not accepted as a reason.

Payment is made by electronic transfer four to six weeks after SEAI has received all documents, plus extra time if an inspection is needed. The amount is the lower of your application value and 45% of the invoiced cost.

How long the whole thing takes

StageTypical time
Quotes, site surveys, contract2–6 weeks
SEAI application to letter of offerVaries — apply early in the window
ESB Networks applicationAt least 4 weeks (20 working days)
InstallationDays to several weeks, depending on size
Document upload1–3 days after completion (if your installer is on it)
SEAI payment4–6 weeks after all documents

Mistakes that cost businesses their grant

  • Starting early. Ordering panels, paying a deposit for materials or starting on site before the letter of offer.
  • Applying through the installer. The applicant must apply; companies and assessors cannot apply on your behalf.
  • Mixing ineligible items into the invoice. Batteries and other extras belong on a separate invoice.
  • Letting the offer expire. Eight months goes quickly when an ESB Networks connection is slow.
  • Wrong bank details or no tax clearance. Both delay payment.
  • Assuming an old offer will be uplifted. Existing applications are not increased to the enhanced rate.

Keep these records

Keep the commissioning certificate, Safe Electric certificate, ESB documents, invoice, photos, datasheets and warranties for the panels, inverters and mounting system, and the operation and maintenance manual. SEAI can audit after payment, and these are also what a buyer or insurer will ask for later.

Get 3 free quotes from SEAI-registered installers — free and no obligation.

Frequently asked questions

Who applies for the SEAI business solar grant — me or my installer?

You do. The applicant is the business owner or authorised signatory. SEAI's terms state that neither the company nor an assessor may apply on your behalf, although your installer uploads the completion documents.

Can I start the installation while my application is being processed?

No. You must receive your letter of offer before purchasing materials or starting work. Costs incurred before approval are ineligible and can lead to the whole grant being withdrawn.

How long is an SEAI business solar grant offer valid?

Eight months from the date of the offer. You must complete the works and submit the Declaration of Works and supporting documents within that time.

How long does SEAI take to pay the business solar grant?

Usually four to six weeks after your solar PV company has uploaded all required documents, with extra time if your installation is selected for inspection.

Do I need tax clearance for the SEAI business solar grant?

Yes, if you will receive more than €10,000 in grants, subsidies or similar payments from public bodies in a calendar year. Business customers apply for tax clearance through Revenue Online Service (ROS).

Sources & further reading