Heat Pump Quote Checklist Ireland: 25 Things to Check Before You Sign

A heat pump installation quote can range from a single-page summary to a detailed 10-page specification. Knowing what must be in every quote — and what red flags to watch for — protects you from hidden costs, undersized equipment, and disputes after installation.

By Smart Solar Editorial · Updated 15 May 2026 · 9 min read

Homeowner reviewing a heat pump installation quote document at a kitchen table with a pen in hand

Receiving a heat pump installation quote without knowing what to look for is like buying a car based on the colour alone. A quote that looks competitive on price may exclude critical work — leaving you with unexpected bills after the installation is complete. A quote that is thorough and transparent is worth paying a premium for.

This checklist covers the 25 items every Irish homeowner should verify before signing a heat pump installation contract. Use it across all quotes you receive to compare them like-for-like.

Why Quote Comparison Is More Complex Than It Appears

Heat pump installation quotes vary widely in what they include and how they present it. Some installers provide detailed, itemised specifications. Others provide a single line — "supply and install heat pump system, €18,500" — with no breakdown of what is and is not covered.

A lower headline price is sometimes genuinely cheaper work — but often it reflects a quote that excludes items the higher-priced quote includes. Common items left out of low quotes:

  • Electrical upgrade to accommodate the heat pump circuit
  • Radiator upgrades in rooms where the existing radiators are undersized at heat pump flow temperatures
  • A new hot water cylinder (assumed to be existing)
  • SEAI technical assessment fee (if below BER B2)
  • Commissioning and first-run optimisation

When comparing quotes, always expand abbreviated items by asking the installer directly: "Is X included in this price or will it be charged additionally?"

Section 1: Equipment Specification

1. Heat pump make and model The quote must specify the exact model — not just the brand. "Daikin Altherma" covers multiple different products at different outputs and prices. You need: "Daikin Altherma 3 R EHBX08D6V" or equivalent.

2. Output capacity (kW) The heat pump output at the design flow temperature must be stated. For a typical 4-bed Irish semi-detached (heat loss 8–10 kW), an 8 kW or 10 kW unit is appropriate. Oversizing causes short cycling; undersizing causes comfort problems in cold weather.

3. Hot water cylinder make, model, and size Most heat pump installations require a new indirect cylinder. The quote should specify the make (e.g., Joule, Heatrae Sadia, Grant), model, and volume in litres. For a 3-bed home, 180–210 litres is typical; for a 4-bed, 210–250 litres.

4. Hydraulic module or buffer tank Split-system heat pumps include an indoor hydraulic module (containing the expansion vessel, circulating pump, and controls interface). Check whether this is included or whether a separate buffer tank is specified and why. Ask: "Is the buffer tank part of the system design or optional?"

5. Controls and thermostat The quote should specify the thermostat model (e.g., Daikin BRC302, Mitsubishi MELCloud controller, Samsung MIM-H04). Smart thermostats with app control are standard with modern heat pumps — confirm this is included.

6. Refrigerant line set (for split systems) For split-system heat pumps (Daikin Altherma split, Mitsubishi Ecodan, Samsung EHS split), the refrigerant pipework between the outdoor and indoor units must be included. Some installers quote the unit prices and charge separately for line sets.

Section 2: Installation Works

7. Electrical works — dedicated circuit Heat pumps require a dedicated circuit from the consumer unit (typically 16–32A depending on the unit). The quote should confirm whether the electrical works are included and whether a Safe Electric-registered electrician will carry them out. If a new consumer unit or panel upgrade is needed, this should be itemised separately.

8. Smart meter compatibility Check that the installation is compatible with your ESB Networks smart meter for night-rate billing optimisation. Ask: "Will you configure the heat pump to use night-rate scheduling on my electricity account?" This is not a physical installation item but an important commissioning step.

9. Groundwork and external pipework For monobloc heat pumps, insulated external pipework connects the outdoor unit to the indoor cylinder. This must be included — pipe runs of more than 3–4 metres are common in Irish semi-detached homes and the pipework should be lagged and clipped correctly.

10. Outdoor unit mounting The outdoor unit may be wall-mounted, ground-mounted, or placed on anti-vibration feet. Ask whether the mounting bracket or anti-vibration feet are included and whether any groundwork (e.g., concrete pad for ground placement) is in scope.

11. Radiator assessment and specified upgrades A properly designed heat pump system requires an assessment of every existing radiator against the room's heat loss at the proposed flow temperature. Ask: "Which radiators are being upgraded and why?" Any radiator upgrades should be specified by room, radiator model, and output.

If the quote does not mention radiators at all, ask explicitly whether they have been assessed and whether any upgrades are needed. If the installer says "your existing radiators will be fine" without having assessed them, this is a serious red flag.

12. Underfloor heating (if applicable) If underfloor heating is being added in any zone (e.g., kitchen extension), the pipework, manifold, and pump set should be itemised with coverage area in square metres.

13. Decommissioning of existing boiler If you have an existing oil or gas boiler being removed, the quote should state: who removes it, how the oil tank is decommissioned (or retained for backup), and whether the flue is sealed. Oil tank decommissioning (cleaning, filling with inert material or removal) may be additional — confirm.

Section 3: SEAI Grant and Compliance

14. SEAI grant handling The quote should confirm whether the installer handles the SEAI grant application on your behalf (standard practice for SEAI-registered contractors) and how the grant is applied — typically deducted from the final invoice total.

The current heat pump grant is €6,500 for air-to-water systems. If a technical assessment is required (homes below BER B2), this costs €200, also SEAI grant-eligible.

15. SEAI technical assessment (if applicable) If your home's BER is below B2, a technical assessment is required before the grant can be approved. Ask: "Is a technical assessment needed for my home? Is the €200 fee included in your quote or additional?"

16. BER certificate — pre and post SEAI may require an updated BER certificate post-installation. Ask whether a new BER assessment is included or whether you need to arrange this separately. Cost: typically €150–€250.

17. SEAI registration confirmation Ask for the installer's SEAI National Register number and verify it at seai.ie/grants/home-energy-grants/heat-pump-grant/find-a-contractor/. An installer who cannot provide this number cannot process the grant.

Section 4: Warranty and After-Sales

18. Manufacturer warranty terms The quote should state the manufacturer warranty clearly:

  • Daikin Altherma: 5-year compressor (extendable to 7 years with registration)
  • Mitsubishi Ecodan: 5-year compressor (extendable to 7 years)
  • Samsung EHS: 5-year compressor
  • Grant Aerona: 5-year compressor (extendable to 7 years)

Confirm the warranty start date (date of installation) and any conditions (annual service, product registration within 30 days).

19. Workmanship warranty Separate from the manufacturer warranty, the installer should offer a workmanship warranty covering their installation work. Minimum 1–2 years; some installers offer up to 5 years on workmanship. Ask: "What warranty do you provide on the installation itself, separate from the manufacturer warranty?"

20. Annual service terms Extended manufacturer warranties (5 → 7 years) are typically conditional on annual professional servicing. Ask: "What annual service do you recommend, what does it cost, and do you offer a service contract?"

Annual heat pump service in Ireland: typically €80–€150.

Section 5: Financial Terms and Timeline

21. Payment schedule Irish consumer protection best practice: avoid paying more than 10–20% upfront as a deposit. The balance should be paid on completion or phased with meaningful milestones. Ask: "What is your payment schedule?" Be cautious of installers requiring 50%+ upfront.

22. VAT breakdown Heat pump equipment and installation in Ireland is subject to 13.5% VAT (reduced rate for construction services and building materials). The quote should show costs both ex-VAT and including VAT. Confirm the VAT rate applied is 13.5%.

23. Project timeline The quote should confirm:

  • Estimated start date
  • Duration of installation (typically 3–5 days for a standard installation)
  • How supply lead times affect the schedule (heat pump units typically 2–8 weeks lead time in 2026)

24. What is explicitly excluded A transparent installer lists exclusions as well as inclusions. Ask: "What is not included in this quote?" Common legitimate exclusions: internal decoration after works, plasterboard repairs, structural works. Unexpected exclusions (electrical, commissioning) are a warning sign.

Section 6: Post-Installation Documentation

25. Commissioning sheet and handover documents After installation, you should receive:

  • Commissioning record confirming system pressures, flow temperatures, and refrigerant charge
  • Manufacturer warranty registration confirmation
  • SEAI grant paperwork and payment confirmation
  • Weather compensation curve settings record
  • System operating manual and control guide
  • F-gas certificate of conformity (for systems with refrigerant handling on-site)

Ask your installer: "What documentation will I receive at handover and when?"

Quote Comparison Template

When comparing multiple quotes, use this structure:

ItemQuote AQuote BQuote C
Heat pump model
Output (kW)
Cylinder (litres)
Controls
Electrical works✓/✗✓/✗✓/✗
Radiator assessment✓/✗✓/✗✓/✗
Radiator upgradesSpecifySpecifySpecify
Commissioning✓/✗✓/✗✓/✗
SEAI grant paperwork✓/✗✓/✗✓/✗
Technical assessment✓/✗/N/A✓/✗/N/A✓/✗/N/A
Compressor warrantyYearsYearsYears
Workmanship warrantyYearsYearsYears
Total price (inc VAT)
Price after €6,500 grant

Adding all the items not included in each quote to the headline price gives you the true like-for-like comparison.

Getting Value from Site Visits

Before any quote is issued, request a site visit. A reputable installer will:

  • Measure rooms and check insulation (or request your BER certificate)
  • Photograph the boiler room, hot water cylinder location, and proposed outdoor unit position
  • Assess the existing radiators
  • Note the electrical consumer unit location and any obvious upgrade requirements

A quote issued without a site visit — by phone, by email based on house type alone — is likely to have significant inclusions assumed or excluded. Treat such quotes as preliminary estimates only, not binding.

Using Smart Solar's Installer Directory

Smart Solar maintains a verified directory of SEAI-registered heat pump installers across Ireland. Each listing includes their SEAI registration number, manufacturer certifications, service areas, and homeowner reviews — giving you a starting point for building your shortlist of installers to invite for site visits and quotes.

Get 3 free heat pump quotes — free and no obligation.

Frequently asked questions

How many quotes should I get for a heat pump installation in Ireland?

Get at least three quotes from different SEAI-registered installers. This gives you a meaningful price range, reveals what is and is not included at each price point, and helps you identify outliers — both unusually cheap quotes (which often exclude critical work) and unusually expensive ones.

What should a heat pump quote include in Ireland?

A comprehensive quote should include: heat pump make and model, output capacity (kW), hot water cylinder (make, model, litres), controls and thermostat, electrical works, refrigerant line set (split systems), radiator assessment and any specified upgrades, outdoor unit mounting, SEAI grant handling, commissioning, and warranty terms for both manufacturer and workmanship.

What VAT rate applies to heat pump installation in Ireland?

Heat pump installation is subject to 13.5% VAT (the reduced rate for construction services in Ireland). Ensure all quotes show both ex-VAT and including VAT totals. Be cautious of quotes that are unclear about VAT — it represents a significant amount on a €15,000–€22,000 project.

Can I get a heat pump quote without a site visit?

You can receive a preliminary estimate without a site visit, but you should not sign a contract based on it. A proper quote requires a site visit to assess radiators, insulation levels, cylinder location, electrical panel, and the proposed outdoor unit position. Quotes issued without a site visit frequently exclude items that require additional charges after the work begins.

How does the SEAI grant affect the quote price?

The €6,500 SEAI heat pump grant is typically deducted from the final invoice by the installer — you pay the net amount and the installer claims the grant directly from SEAI. Confirm in the quote whether the stated price is before or after the grant deduction. Most quotes in Ireland now present both the gross price and the net price after grant.